Projects

TLE HX Strip and Retube

Enhancing Propane Processing Operations

Read More

Underground System for Propane Transfer

Propane Transfer Solutions

  • Fabricated 18,000-gallon pressure vessel.
  • Completed engineering, design, construction, and installation of equipment.
  • Provided truck unloading stanchion, dual redundant regulatory, and emergency shutdown system.
  • Vessel fabrication and landscape architecture. 
    Learn more about our storage tank solutions here.
Read More

NGL Pipeline to Truck Terminal

Revolutionizing Propane Industry Operations

  • Complete engineering & construction of storage facility
  • Supply of custom fabricated 90,000 storage tanks
  • Installation of vertical turbine high differential pumps
  • Construction of control/operations building
    Learn more about our storage tank solutions here.
Read More

Propane-Air System for Glass Industry

Enhanced System Design & Installation

  • Refurbished (3) 30,000 propane storage tanks for enhanced capacity.
  • Design & installation of propane storage infrastructure.
  • Installed new propane air system and duplex pump package. 
  • Installation of new propane-air system.
  • Startup, training, and commissioning.
    Learn more about our storage tank solutions here.
Read More

Power Generation Facility in Latin America

Industrial Fuel Storage Solutions for Reliable Infrastructure

Read More

Propane-Powered Asphalt Operations

Propane Fueled Asphalt Operations

  • Propane supply with baseload optimization to an asphalt aggregate burner facility. 
  • Efficient liquid vaporization solution supplying 110 MMBTU/hour.
  • 120' underground pump system for propane transfer.
  • New 30,000-gallon propane storage tank.

    Learn more about our storage tank solutions here.
Read More

Propane, Butane Rail Terminal

LPG & Butane Rail Terminal - Terryville, CT

  • Accepts simultaneous receipt of products
  • (6) 90,000 gallon storage vessels
  • (4) dual-sided towers - loads up to (8) cars simultaneously
  • (2) dual-sided automated loading skids
  • Pre-fabricated piping and equipment
  • Completion time: 9 months


Learn about our rail  terminal engineering construction services

Read More