Projects

Landfill-to-RNG Facility Piping Fabrication, Installation & Construction

Sustainable Energy Solutions: MIG's RNG Piping Project

  • Fabrication of Process Piping
  • Material Procurement and Inspection
  • Connection of Underground and Above-grade Piping
  • Application of Coatings for Piping and Steel
  • Efficient Project Management Services
  • Control System Integration for Facility Optimization
Read More

RNG Facilities for Landfills

Sustainable Power for NC Landfills

Read More

Heat Exchanger Replacement

Optimizing Energy Efficiency Through Equipment Upgrades

Read More

LNG & Diesel Fuel Conversion

LPG Storage & Vaporization System

Read More

EPC Solution for Power Generation

From Design to Start-up: Storage & Gasification

  • Custom 500-gal pressurized storage tanks
  • Engineering and design of hydrocarbon storage and gasification system
  • Full compliance review with local and national codes
  • EPC Solution for a hydrocarbon propellant recycling facility
  • Learn more about our storage tank solutions here.
Read More

Butane Transload Facility Construction

EPC Butane Transload Facility Construction

  • Repurposed (2) 30,000 gallon propane storage tanks.
  • Dismantled and decommissioned existing bulk plant for project requirements. 
  • Managed the project from design to commissioning.
  • Provided all NFPA 58 required signage for safety compliance.
    Learn more about our reactor fabrication solutions here.
Read More

Fabrication of Cyclopentane Tower

Installation for Petrochemical Facility

  • Turnkey project completed in McGregor, Texas facility for Gulf Coast petrochemical manufacturer. 
  • Cyclopentane Tower specifications: 42" diameter x 852" length, SA516-70N material.
  • Designed with a design pressure of 160 PSI and ASME SEC. VII Div. 1 code compliance.
    Learn more about our reactor fabrication solutions here.
Read More

Precision Tank engineering & Fabrication

Custom Stainless Steel Tank Fabrication

  • Designed, engineered, and fabricated [8] 5,000 gallon stainless steel finishing and mixing tanks. 
  • Fabrication of mixer supports, internal baffling, and sparger rings. 
  • Turnkey operations setup by sister company, MIG. 

    Learn more about our custom fabrication solutions here.
Read More

LNG Fuel Gas Mixing Vessel

Transforming LNG Export Facilities

  • Designed as per ASME Sect. VIII Division 2 guidelines.
  • Fabricated 621,000 gallon high pressure fuel gas mixing vertical vessel.
  • Vessel Dimensions: 192” Diameter x 69’ Seam-to-Seam, 81’4” Height
  • Lead time of 4 month and upon completion sent to Louisiana. 
    Learn more about our fabrication services and solutions here.
Read More

Organic Chemical Plant Reactor Fabrication

Hastelloy C-276 ASME Reactor Fabrication

  • Bendel, a subsidiary of TransTech, designed and fabricated a 6,000-Gallon Hastelloy C-276 ASME Reactor. 
  • Zone shell and bottom half pipe jacket design for maximum efficiency.
  • Bead blast finish for enhanced exterior durability.
  • Project caters to organic chemical processing plant requirements.
  • Learn more about our reactor fabrication solutions here.
Read More

Receive Our Project Updates
Subscribe by Email:

Recent Posts