News & Events

WHEN THE LAUNCH SCHEDULE CAN’T WAIT

Posted by Admin on Mon, Sep 28, 2026 @ 04:49 PM

When the Launch Schedule Can’t Wait

How TransTech Energy modified a 30,000-gallon vertical water deluge tank for an aerospace launch facility on an accelerated timeline.

In aerospace, having equipment arrive early can be a very good problem to have.

A customer needed a 30,000-gallon vertical carbon steel tank for a launch pad water deluge system, and they needed it fast. Rather than starting with a new vessel and a traditional fabrication schedule, TransTech Energy looked to its existing tank inventory.

Read More

Tags: R-Stamp Repair, aerospace, Tank Refurbishment, used storage tank, Vertical Storage Tank

Subscribe to our blog

Are Your Bulk Plants & Terminals Compliant?
Download Now

Latest Posts

Posts by category

Posts by popularity