- ESI provided EPC Contractor Services for a 3.2MW expansion of a landfill gas-to-energy facility
- Equipment included 2 Caterpillar G3520C Engine/Generators for increased capacity
- Broad scope covered turn-key design, utility interconnection, SCADA systems, and construction oversight.
Learn more about our storage tank solutions here.
|